Case Study
Wastewater tunnels and treatment plants are dense, three-dimensional structures where concrete, steel and MEP installations all compete for space. As a land surveyor on Norwegian projects such as VEAS Slamsilotunnelen and UBRA – Bekkelaget wastewater treatment plant, I was responsible for all surveying work: from setting-out to as-built documentation. The focus was to keep construction within tight tolerances and give the project team reliable data for coordination and handover.

Treatment plants and associated tunnels have complex geometry and dense technical installations. Misalignment of walls, shafts or pipe penetrations can cause costly rework, delays and long-term operational problems. The contractor needed a surveying lead who could plan and execute all measurements, ensure traceable dimensional control, and keep construction aligned with both the 3D design and strict client requirements.
As surveying manager, I planned the control network, measurement methods and check routines for each construction phase. This included selecting instrument setups, defining tolerances and agreeing control procedures with the project engineers and site management.
On site, I set out formwork, walls, slabs, tunnels and shafts against the 3D design, provided ongoing support to site crews, checked critical dimensions before concrete pours and after striking formwork.
For complex areas, I used laser scanning to capture full 3D geometry. Scans were registered and compared with design to detect deviations, clashes or deformations early, and to provide as-built point clouds and models for the contractor and client.
I prepared survey reports, deviation logs and final as-built documentation, giving the project a clear dimensional record for commissioning and future maintenance.